The intelligent construction Wall Production Line is high automation, strong stability, high production efficiency, advanced technology which reduces the cost of products, improve the quality of products and production efficiency.it is the current advanced light partition board mechanized production line.

Company News Industry News

Operation Method of Cement Flue Machine

Release date:2020-07-18Views:

  1. open press the mold shrink button to retract the inner mold. Loosen the two handles on the upper part of both sides of the box plate, then open all the baffles on both sides of the box plate and the front end of the mold box.

  2.  oil Use the prepared waste oil to wipe the inner die on all sides, inside of both sides of the box plate, bottom plate and inside of the front baffle all evenly, so as to facilitate later demoulding.

  3. installation of silkscreen Cut the glass wire mesh, wire mesh or plastic mesh cloth to a little shorter than the total length of the flue pipe.

  4.  box Close both sides of the machine box plate and front baffle, pull the fastening handle, press the front baffle latch. Then press the push button and push the inner mold open.

  5.  adding hot steam Connect boiler steam to flue gas pipe with gas pipe and keep gas supply adequate.

  6. grouting molding Mix the cement and sand evenly according to the ratio of 1:2.5 to 1:3(or adjust the proportion according to the customer's demand), stir in the mixer and pour into the mold box until the upper layer is higher than the grid. Then start the vibration machine until the cement slurry fills the gap between the inner and outer mold no longer continues to decrease downward, and then close the vibration machine. The upper cement slurry height is leveled with the positioning angle iron, the excess cement is removed, and finally the oil-light plate is used to pull back and forth to smooth, which can wait for forming.

  7.  waiting for solidification After waiting for a certain time (depending on the smoke pipe shape and wall thickness), observe the cement solidification on the upper surface of the flue pipe, when the water on the cement surface is obviously reduced, the finger pressure feels a certain hardness, can enter the open box program.

  8. mold and transport

    Stop the air supply, close the air valve ;

    take back the internal mold (the left and right sides of the mold, then the upper and lower sides);

    3 open the front baffle and both sides of the box plate. Place a solid roller transfer vehicle and pull the flue pipe along with the bottom plate to the transfer vehicle. After rolling all the flue pipes on the transfer vehicle, transfer to the appropriate storage point, and then into the next production cycle mode. 