Product Introduction

  

      Horizontal cement silo is cylindrical structure, the bottom is supported by four round pipe legs, the whole silo is steel structure, welded;The top is provided with dust collector and pressure protection valve.

Horizontal cement silo meets the industry standard. The silo body is made of steel plate with grooved hoops, and the legs are welded by national standard pipe.The capacity is 50T, 60T, 100T, 150T, 200T, 500T and other different specifications, can also be customized according to the size of the user requirements.

Working principle


一、储料仓固定好以后,由散装水泥车运送水泥至工地,然后将散装水泥车的输送管路与水泥仓(水泥罐)的进料管路相接,通过散装水泥车的气体压力将罐内水泥输送到水泥仓(水泥罐)内。

二、在往储料仓内输送水泥的过程中,操作人员要不间断的按动除尘器振动电机的按钮,抖落附着在除尘器布袋上的水泥,防止堵死布袋,发生爆仓。

三、一旦堵死布袋,仓内压力超过仓顶压力安全阀的安全压力,压力安全阀即可打开释放仓内压力,防止爆仓事故的发生。

四、通过高低料位可以观察到仓满和缺料。

五、当需要放料时,要先打开锥体底部的手动卸料阀,然后通过水泥输送装置(螺旋输送机)将水泥输送出去。


1. After the warehouse is fixed, the bulk cement truck transports cement to the site, and then the conveying pipeline of the bulk cement truck is connected with the feeding pipeline of the cement warehouse (cement tank), and the cement in the tank is transported to the cement warehouse (cement tank) through the gas pressure of the bulk cement truck.

2.In the process of conveying cement to the storage bin, the operator should press the button of the vibration motor of the dust catcher to shake off the cement attached to the bag of dust catcher to prevent the bag from blocking and the bin from bursting.

3.Once the bag is blocked, the pressure in the warehouse exceeds the safety pressure of the pressure relief valve at the top of the warehouse, the pressure relief valve can be opened to release the pressure in the warehouse, to prevent the occurrence of the explosion of the warehouse accident.

4.Through the high and low level can observe the warehouse full and short of material.

5.When discharging is needed, the manual unloading valve at the bottom of the cone should be opened first, and then the cement is transported out through the cement conveying device (screw conveyor).


Technical parameter


1、Check the horizontal cement tank before starting work.Before the cement tank starts, each controller should be checked to see whether it is good or not. After the shutdown, water and stones should be poured into the mixing tank for 10-15 minutes, and then the objects in the tank should be cleared.When cleaning it is necessary to pay attention to be sure to shut off the switch, and have a person to watch.

2、Cleaning method of horizontal cement tank.Regular cleaning of cement tanks is essential, but most users do not master the skills of cleaning them, which may cause deformation of cement tanks or paint damage due to excessive force.Therefore, in the process of cleaning, it is forbidden to use sledgehammer to remove the concrete stored in the bulk cement tank cylinder, and only use chisel to remove.

3、定期进行维护和保养。水泥罐的维护、保养,清洗、润滑、加油这些方面都是不可忽视的而且需要重视的细节部分,一定要严格执行。