The intelligent construction Wall Production Line is high automation, strong stability, high production efficiency, advanced technology which reduces the cost of products, improve the quality of products and production efficiency.it is the current advanced light partition board mechanized production line.
Release date:2020-07-17Views:次
Thin lightweight partition board with components, high scalability, good shock resistance, low alkalinity, the free expansion ratio small anti-cracking performance is reliable, stable quality, moisture-proof, sound insulation, heat preservation, non-combustible, saw, drill, hammer, planer, simple construction may chisel, metope smooth, to avoid the wet operation, improve the construction environment, save the land resources, light weight to reduce the load in the building, (clay brick is 1/6-1/8) based and reduce the beam, on reinforced concrete, reduce the project total cost, expand the usable floor area.
The lightweight partition board shall first lift the side of the board to the position where the beam and the bottom surface of the board have installation lines. The bonding surface shall be completely daubed with the prepared cement mortar, and the splay Angle shall be made on both sides.Installation sequence;No door hole, from the outside inside installation, there is a door hole, from the door hole to the two sides of the extension, the door hole side appropriate with the whole board, vertical board when one person in the side to push, one person in the following with a wide mouth hand pry bar pry, edge top side pry, make it squeeze tight gap, in order to squeeze the glue paste for the appropriate.
When the lightweight partition wall is pushed, it should pay attention to whether the strip deviates from the installed edge line, and timely use vertical line and aluminum alloy by ruler correction, leveling the panel surface, find straight.After the installation of the first board, it is advisable to check the bonding gap between the column side board is not more than 15mm. After qualification, it is advisable to use wooden wedge to tighten the bottom and top of the board and use a scraper to make up and scrape the extrudable cement mortar. Based on the installed first board, the whole wall board shall be installed according to the method of the first board.