News


The intelligent construction Wall Production Line is high automation, strong stability, high production efficiency, advanced technology which reduces the cost of products, improve the quality of products and production efficiency.it is the current advanced light partition board mechanized production line.

Company News Industry News

Use and operation of partition board machine

Release date:2020-07-17Views:

Inspection preparation before operation, site cleaning and coating of isolation agent.The isolating agent is purchased by the user. It should be non-toxic and odorless, non-irritating, with good isolation effect, non-corrosive to the table and products, and low in price, to prevent the products from sticking to the surface of the site and making it difficult to remove the plate.

Check and adjust cavity size.The vibration plate should be in a free state. There should be a gap of 1.5-2.5mm between the four sides and the surrounding parts. The height and position should be 1.5-2mm higher than the front end and bottom of the forming scraper.The height of the forming scraper to the bottom of the wallboard;Front end (contact with vibration plate) 59mm, rear end 58mm;

Pull the partition board machine into the station, the inside of the two front wheels are stuck on the outside of the two strips respectively, and the end of the left and right wall panels are also stuck on the outside of the two strips respectively, and adjust the extruder to the working state.

Check whether the fastening parts are loose (especially the bolts of the front and rear struts and the bolts of the electrical system should be checked), check the oil level of the reducer and make it meet the requirements;There should be no debris in the hopper. Press the butter against the butter nozzle on the vibration guide rod.Turn on the main power switch and start the main motor agitator rotation.

Start the main motor of partition board machine and drive the agitator to run empty. If there is any abnormal phenomenon, stop immediately for inspection.Do not start the vibrator in no-load condition to avoid damage to parts.



上一篇: Policies and measures for wall materials during the 12th Five-Year Plan Period
下一篇:Overall requirements for partition board development